Milestone Pump Co., Ltd ONLY PUMP, MORE THAN PUMP
banner
Home » News » Content
Product Categories

Submersible Sewage Pump Operation Manuls

- Dec 19, 2017 -

Installation instructions

Submersible sewage pump rings on the chain link for lifting and put down the pump. There are three installation:

1. WQ、WQK Type submersible sewage pump automatic coupling installation type

① Coupled device installation: Coupled with Bolts and Pump body connection; Outlet pipe seat fixed at the bottom of the pit; Under the guide bar cover in the outlet pipe mounting holes, The above section installed in guide bar on the shelf; at last, the guide bar frame fixed on the pool wall or other can be installed on the support;

② Pump installation: Lifting pump, the shelves of coupling Pilot hole aiming the guide bar slowly relax after sling, pump piston rod down along until the pump body outlet and the pipe mouth on the bridge automatically; The weight of the pump with the pump flange surface and outlet pipe seat surface close together joint.

③ Guide bar frame with M16 x 150 Ι type expansion bolt fixed.

2. WQ type submersible sewage pump hard tube mobile installation

Pump support by the pump seat, the vertical outlet pipe, connect the bend pipe and pump, put pump into water, and connect the horizontal pipe and vertical outlet pipe. The hanging chain connect pump end and another end fixed in the pit.

3. QW、WQK Type submersible sewage pump hose tube mobile installation

Pump support by the pump seat, connect outlet hose tube, hose bent joints together, and put the pump into the water. The hanging chain connect pump end and another end fixed in the pit